Fourth Cement Pour in Walls

Cement Pour in Walls

The main floor walls have been stacked. We were wondering if there were enough block to finish the job, but the crew made it through the top row.

It’s quite fitting, I think, that the fourth (and final!) cement pour occurred in a downpour. Today we woke up to snow (SNOW!) that later turned to rain. But still, the work went on, thanks to our great crew.

After the main floor is cleaned up, the plumber will set the pipes for the radiant heating. Next the cement floor will be poured.

It still looks like a fort, but it’s home to me!

{ 6 comments… add one }
  • Sarah Patino March 31, 2010, 9:10 pm

    Woo Hoo! Did they fix the misplaced door?

  • Alison Moore Smith April 1, 2010, 12:10 am

    They did. Brad chunked out the cement himself and then another crew member moved the door and filled in the block on the other side. It’s just right!
    .-= Alison Moore Smith hopes you’ll read 15 Simple Steps to Ruin Your Blog with Email =-.

  • Looking good…I vote for more pictures! Plus I’m thinking you need to write a guest post for my site and show everyone this cool “CONCRETE” house 🙂
    .-= Todd – Home Construction & Improvement hopes you’ll read Basement Sump Pumps =-.

  • Alison Moore Smith April 1, 2010, 11:00 am

    Thanks, Todd. I have more, just haven’t resized them. I’ll try to upload them today. 🙂

    And I do plan to do a guest post. Just have to get some big family things out of the way. Next week is looking better, so I’ll be thinking about sending you something.
    .-= Alison Moore Smith hopes you’ll read Thesis 1.7 Upgrade is Here =-.

  • Alison Moore Smith April 1, 2010, 1:59 pm

    Todd and all, the new images are posted. You can see the most recent in the rotating media box at the top of the right navbar. To see them all, just look at the house progress montage.
    .-= Alison Moore Smith hopes you’ll read 15 Simple Steps to Ruin Your Blog with Email =-.

Leave a Comment

CommentLuv badge

Next post:

Previous post: